1
Enquiry period
2
Bidding period
3
Auction
4
Evaluation
5
Bids have been evaluated
Status Active
Estimated value without VAT 61 130,18 MDL

Supplier technical support:

(+373) 79999801


This procedure is carried out without auction. Your offer is final and must contain the entire list of required documents.

-
Information about customer
Fiscal code/IDNO
Address
6301, MOLDOVA, Leova, or.Leova, Unirii nr.22
Web site
---
The contact person
Full name
Iurie Grețu
Contact phone
069033357
Purchase data
Date created
Date modified
6 Jun 2026, 17:29
Estimated value (without VAT)
61 130,18 MDL
Achizitii.md ID
21629253
Type of procedure
Reporting of purchases
Award criteria
The lowest price
Delivery address
6301, MOLDOVA, Leova, or.Leova, Unirii nr.22
Contract period
12 May 2026 17:02 - 31 Dec 2026 16:02
List of positions
1)
Title
Confectii metalice diverse din profile laminate, tabla, tabla striata, otel beton, tevi profilate40x20x3mm, 135 m, cornier 40x40x3mm-42m, pentru sustineri sau acoperiri inglobate total sau partial in beton CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 371.28
Unit of measurement: Kilogram
2)
Title
Captuseloâi metalice din tabla perforata gr.3mm, cu inaltimi pina la 35 m CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 0.078
Unit of measurement: Tona; tona metrica (1000 kg)
3)
Title
Vopsitorii din miniu din plumb aplicate la pozitie, intr-un strat pe suprafata constructiilor metalice din tabla, plane sau curbe /cuve, recipiente, pilnii de silozuri etc./ aferente halelor industriala executata mecanizat cu vopsea de miniu din plumb pe baza de rasini alchidice, pentru vopsitorii executate la sol pentru primul strat de vopsea. CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 22.92
Unit of measurement: Metru
4)
Title
Vopsitorii din miniu de plumb aplicate la pozitie intr-un strat pe suprafata constructiilor metalice din tabla, plane sau curbe / cuve, recipiente, pilnii de silozuri etc./ aferente halelor industriale executate mecanizat cu vopsea de miniu de plumb pe baza de rasini alchidice, pentru vopsitorie executata la sol, pentru aplicarea unui strat suplimentar de vopsea CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 22.92
Unit of measurement: Metru
5)
Title
Decaparea de imbracaminti cu stratul de pina la 3 cm grosime formate din covoare asfaltice permanente, betoane sfaltice CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 50.4
Unit of measurement: Metru
6)
Title
Sapatura manula de pamint in spatii intinse la deblee la canale deschise la gropi de imprumut la indepartarea stratului vegetal de 10-30 cm grosime in pamint cu umiditate naturala aruncarea in depozit sau vehicul a carei platforme este sub cel mult de 0.60 m peste nivelul sapaturii teren usor CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 10.8
Unit of measurement: Metru
7)
Title
Compactarea pamintului cu piatra sparta CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 0.504
Unit of measurement: Metru
8)
Title
Strat de fundatie din pietris CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 2.52
Unit of measurement: Metru
9)
Title
Pasaje executate din placi de trotuare din beton prefabricat asezate pe un strat din amestec uscat de ciment și nisip in proportie 1:6 rostuit cu amestec uscat de ciment si nisip grosime de strat de 5 cm CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 68.4
Unit of measurement: Metru
10)
Title
Asigurari sociale CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 24.0
Unit of measurement: Bucata
11)
Title
Transportarea materialelor CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 10.0
Unit of measurement: Bucata
12)
Title
Cheltuieli de regie CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 14.5
Unit of measurement: Bucata
13)
Title
Beneficiu de deviz CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 6.0
Unit of measurement: Bucata
14)
Title
TVA CPV: 45420000-7 - Joinery and carpentry installation work
Quantity: 20.0
Unit of measurement: Bucata
Unfortunately, questions can be asked only during the "Active" period.
Clarifications