1
Enquiry period
with 30.03.2026 14:40
to 19.04.2026 17:24
2
Bidding period
with 19.04.2026 17:24
to 02.05.2026 17:24
9 days left
3
Auction
will not be used
4
Evaluation

5
Contract

Status Bidding period
Estimated value without VAT 15 151 210 MDL
Period of clarifications: 30 Mar 2026, 14:40 - 19 Apr 2026, 17:24
Submission of proposals: 19 Apr 2026, 17:24 - 2 May 2026, 17:24

Supplier technical support:

(+373) 79999801


This procedure is carried out without auction. Your offer is final and must contain the entire list of required documents.

Advertising
Subscribe
Advertising

Conform Caietului de sarcini

Information about customer
Fiscal code/IDNO
Address
MD-2068, MOLDOVA, mun.Chişinău, mun.Chişinău, str. Miron Costin 24
Web site
---
The contact person
Full name
Lilia Scutar
Contact phone
+373 60 02 73 02
Purchase data
Date created
30 Mar 2026, 14:40
Date modified
17 Apr 2026, 17:24
Achizitii.md ID
21589389
CPV
45200000-9 - Lucrări de construcţii complete sau parţiale şi lucrări publice
Type of procedure
Open tender
Award criteria
The lowest price
Funding sources
Advertising
Documents of the procurement procedure
duae.doc
Bidding Documents
-
30.03.26 14:40
ds_lucrari (2).docx
Bidding Documents
-
30.03.26 14:40
caiet de sarcini (2).docx
Bidding Documents
-
31.03.26 19:27
anunț de participare (1) (1).signed.pdf anunț de participare (1) (1).signed.pdf
Bidding Documents
-
1.04.26 09:12
si1.pdf si1.pdf
Bidding Documents
-
8.04.26 17:19
si1 pl5 pl 6.pdf si1 pl5 pl 6.pdf
Bidding Documents
-
8.04.26 17:19
pl 3.pdf pl 3.pdf
Bidding Documents
-
8.04.26 17:25
pl 15 -1.pdf pl 15 -1.pdf
Bidding Documents
-
8.04.26 17:25
pl 2.pdf pl 2.pdf
Bidding Documents
-
8.04.26 17:25
rac.pdf rac.pdf
Bidding Documents
-
8.04.26 17:25
pl 3-1.pdf pl 3-1.pdf
Bidding Documents
-
8.04.26 17:25
pl 11.pdf pl 11.pdf
Bidding Documents
-
8.04.26 17:25
pl 17.pdf pl 17.pdf
Bidding Documents
-
8.04.26 17:25
su.pdf su.pdf
Bidding Documents
-
8.04.26 17:25
pl 13.pdf pl 13.pdf
Bidding Documents
-
8.04.26 17:25
pl 3.pdf pl 3.pdf
Bidding Documents
-
8.04.26 17:25
pl 15.pdf pl 15.pdf
Bidding Documents
-
8.04.26 17:25
pl 11-1.pdf pl 11-1.pdf
Bidding Documents
-
8.04.26 17:25
pl 13 cota 3.300.pdf pl 13 cota 3.300.pdf
Bidding Documents
-
8.04.26 17:25
eef.pdf eef.pdf
Bidding Documents
-
8.04.26 17:25
pl 17-1.pdf pl 17-1.pdf
Bidding Documents
-
8.04.26 17:25
pl 9.pdf pl 9.pdf
Bidding Documents
-
8.04.26 17:25
deviz 2-1-7 (ajustat).pdf deviz 2-1-7 (ajustat).pdf
Bidding Documents
-
16.04.26 11:01
2-1-7 desfasurat.pdf 2-1-7 desfasurat.pdf
Bidding Documents
-
17.04.26 17:24
Date:
31 Mar 2026, 10:47
Question's name:
caiet de sarcini WORD
Question:
Buna ziua, rugam sa plasati caietul de sarcini in format word, multumesc.
Answer (31 Mar 2026, 19:31):
Bună seara! Documentul respectiv a fost plasat pe plaftormă recent.
Date:
1 Apr 2026, 10:48
Question's name:
Caiet de sarcini
Question:
poz. 196, 237 CK29F Tavane suspendate din panouri prefabricate "Armstrong",medical ,inclusiv sistemul-grila. Pentru ce in institutie de invatamint trebuie panouri medicali? clarificati va rog? Poate ca este o greseala?
Answer (1 Apr 2026, 17:48):
In poz.196 . 237 Tavan suspendat din panouri "Amstrong " obisniute (vezi F1 norme resurselor).
Date:
2 Apr 2026, 11:51
Question's name:
Caiet de sarcini
Question:
Ferestrele de aluminiu deviz 2-1-1 poz 106-111, 116-119, 123-125 indicati Va rugam tipul deschiderilor si componenta geamului termopan (LowE ....... sau?)
Answer (6 Apr 2026, 07:24):
Buna ziua, în Anunț este scris clar Agentul economic trebuie să vină la fața locului și să ia cunoștinșă cu obiectul, astfel decad întrebările de acest gen.
Date:
3 Apr 2026, 08:46
Question's name:
Anunt de participare
Question:
Care este sursa de finantare?
Answer (6 Apr 2026, 07:19):
buna ziua, sursa de finanțare este bugetul de stat
Date:
3 Apr 2026, 08:55
Question's name:
Termenul de depunere a ofertei
Question:
Bună ziua, În contextul sărbătorilor pascale, în perioada 12.04.2026 – 20.04.2026, precum și a zilelor de odihnă aferente (inclusiv pentru furnizorii locali), vă rugăm respectuos să examinați posibilitatea extinderii termenului de depunere a ofertelor. Menționăm că perioada indicată de dvs. pentru depunerea ofertelor coincide, în mare parte, cu zile declarate nelucrătoare la nivel de stat, astfel încât, în mod efectiv, rămân disponibile doar aproximativ jumătate din zilele lucrătoare. Totodată, în intervalul dintre Paște și Paștele Blajinilor, o mare parte dintre operatorii economici și furnizorii locali se află în concedii, ceea ce reduce considerabil activitatea și posibilitatea de pregătire corespunzătoare a ofertelor. În acest sens, solicităm insistent prelungirea termenului de depunere a ofertelor până la data de 27.04.2026. Considerăm că această ajustare este justificată și conformă cu prevederile legale, inclusiv art. 47 alin. (2), unde termenul de 20 de zile se referă strict la perioada de depunere a ofertelor, nu la întreaga durată a procedurii. Vă mulțumim anticipat pentru înțelegere și cooperare.
Answer (6 Apr 2026, 07:20):
buna ziua! 1.Conform art. 47 alin. (2) din Legea nr. 131/2015: • termenul minim (de regulă 20 de zile) trebuie să fie calendaristic, nu doar lucrător; • legea nu exclude perioadele cu sărbători, atâta timp cât termenul total este respectat. Prin urmare, chiar dacă există 2 zile nelucrătoare: • procedura rămâne legală, dacă termenul minim este respectat. 2. Nu există restrângere reală a concurenței Fapt important: • majoritatea zilelor din interval sunt lucrătoare; • operatorii economici au timp rezonabil pentru pregătirea ofertelor. Argumentul privind „jumătate din zile indisponibile” nu este susținut factual. 3. Concediile private NU sunt temei legal Afirmația că: „operatorii economici sunt în concedii între Paște și Paștele Blajinilor” nu constituie temei juridic, deoarece: • legislația ia în calcul doar zilele oficial nelucrătoare; • organizarea internă a companiilor este responsabilitatea acestora.
Date:
6 Apr 2026, 08:46
Question's name:
Răspuns (6 apr 2026, 07:20): buna ziua! 1.Conform art. 47 alin. (2) din Legea nr. 131/2015: • termenul minim (de regulă 20 de zile) trebuie să fie calendaristic, nu doar lucrător; • legea nu exclude perioadele cu sărbători, atâta timp cât termenul total este respectat. Prin urmare, chiar dacă există 2 zile nelucrătoare: • procedura rămâne legală, dacă termenul minim este respectat. 2. Nu există restrângere reală a concurenței Fapt important: • majoritatea zilelor din interval sunt lucrătoare; • operatorii economici au timp rezonabil pentru pregătirea ofertelor. Argumentul privind „jumătate din zile indisponibile” nu este susținut factual. 3. Concediile private NU sunt temei legal Afirmația că: „operatorii economici sunt în concedii între Paște și Paștele Blajinilor” nu constituie temei juridic, deoarece: • legislația ia în calcul doar zilele oficial nelucrătoare; • organizarea internă a companiilor este responsabilitatea acestora.
Question:
Bună ziua, stimată autoritate contractantă, Perioada de depunere a ofertelor este stabilită între 10 aprilie și 20 aprilie, oferind în total 10 zile pentru încărcarea documentației. Totuși, din acest interval, 4 zile sunt de weekend, iar data de 20 aprilie coincide cu sărbătoarea religioasă „Paștele Blajinilor”. În consecință, rămân efectiv doar 5 zile lucrătoare pentru elaborarea și depunerea ofertelor. În acest context, vă rugăm respectuos să analizați posibilitatea prelungirii termenului-limită cu cel puțin 1–2 zile, pentru a asigura condiții echitabile tuturor participanților. Vă mulțumim pentru înțelegere.
Answer (6 Apr 2026, 09:13):
Bună ziua. Termenul limită de depunere a ofertelor a fost extins până la 23.04.2026.
Date:
6 Apr 2026, 09:02
Question's name:
CS
Question:
Ferestrele de aluminiu deviz 2-1-1 poz 106-111, 116-119, 123-125 indicati Va rugam tipul deschiderilor si componenta geamului termopan (LowE ....... sau?) . Nu raspundeti evaziv. Descrieti asa cum ati putut descrise pozitia cu usi in caietul de sarcini. Este responsabilitatea AC sa descrie cerintele clar pentru participantii la licitatie
Answer (6 Apr 2026, 13:13):
„Fereastră cu două foi (canaturi), prevăzută cu sistem de deschidere combinată: deschidere batantă spre interior și deschidere oscilo-batantă (pentru aerisire controlată), asigurând ventilația spațiului și utilizarea în condiții de siguranță în instituția de învățământ primar.” Ferestrele de aluminiu LowE
Date:
7 Apr 2026, 10:51
Question's name:
Caiet de sarcini
Question:
Nr. 2-1-7 Incalzire poz.19 IC38E in descrieire este indicat "Cot PPR 45 d=50", dar in resurse"Racord olandez PPR 32x1 masc". Care varianta este correcta?
Answer (9 Apr 2026, 10:26):
Nr. 2-1-7 Incalzire poz.19 IC38E varianta corecta: Cot PPR 45 d=50
Date:
8 Apr 2026, 11:03
Question's name:
CAiet de sarcini 2-1-7 Incalzire
Question:
Pozitia 6 Radiatoare din bi-metal, corpul de radiator avind 10 elemente, 121 buc confirmati că este necesar un număr de 121 de calorifere, fiecare fiind compus din 10 secții/elemente, ceea ce constituie în total 1210 elemente/secțiuni.
Answer (9 Apr 2026, 10:26):
Pozitia 6 Radiatoare din bi-metal correct 10sectii a cite 121 buc, total 1210 sectii
Date:
8 Apr 2026, 11:30
Question's name:
Caiet de sarcini
Question:
Nr. 2-1-7 Incalzire poz.33 2035-07 in descrieire este indicat "Robinet sferic sub sudura DN 50 ", dar in resurse"Robinet sferic sub sudura DN 32". Care varianta este correcta?
Answer (9 Apr 2026, 10:26):
Nr. 2-1-7 Incalzire poz.33 2035-07 varianta corecta : Robinet sferic sub sudura DN 50
Date:
8 Apr 2026, 11:31
Question's name:
Caiet de sarcini
Question:
Nr. 2-1-7 Incalzire poz.35 in descrieire este indicat "Robinet sferic cu filet FF DN 50 PN25 ", dar in resurse"Manometru 0 - 1.0 MPa G1/2" D100ic cu filet FF DN 32 PN25". Care varianta este correcta?
Answer (9 Apr 2026, 10:30):
Nr. 2-1-7 Incalzire poz.35 varianta corecta : Robinet sferic cu filet FF dn 50 PN25
Date:
8 Apr 2026, 11:39
Question's name:
Caiet de sarcini
Question:
Nr. 2-1-7 Incalzire poz.25 IC40B in descrieire este indicat "Bratara pentru fixarea conductelor din otel pentru instalatia de incalzire centrala sau gaze, montata prin dibluri de 1 1/4" - 2", pe dibluri din PVC pe zid de caramida/ d= 50 ", dar in resurse"Bratara fixare d32". Care varianta este corecta?
Answer (9 Apr 2026, 10:29):
Nr. 2-1-7 Incalzire poz.25 IC40B varianta corecta: "Bratara fixare d 50".
Date:
8 Apr 2026, 11:48
Question's name:
2-1-2 Retele de apa si canalizare interioare
Question:
Compensator de dilatatie format U,din teava din material plastic, avind diametrul de 32 mm (Tub de protectie din polietilena d-32x2.5mm) - 10 bucati dar la resursa Tub de protectie din polietilena d-32x2.5mm - 13 metri Clarifiacti diferenta de cantitate si unitate de masura
Answer (14 Apr 2026, 18:39):
Caiet de sarcini №2-1-2 Retele de apa si canalizare interioare.Norma data este primita aplicativ pentru tub de protectie . Cantitatea tevilor din polietilena d-32x2.5mm-13 m
Date:
8 Apr 2026, 16:56
Question's name:
proiect de exectutie
Question:
Publicati va rog proiectul tehnic pentru toate compartimentele. Multumesc.
Answer (9 Apr 2026, 10:25):
am publicat
Date:
8 Apr 2026, 17:48
Question's name:
2-1-3 Caiet de sarcini
Question:
Bună ziua, Vă rog să clarificați situația din capitolul 3 „Utilaj”, poziția 201 (08-03-575-1). Aceasta este indicată ca poziție de montare, unde este inclusă și manopera. În aceste condiții, considerăm că există o eroare, deoarece recapitulațiile nu sunt calculate corect.Vă rugăm să verificați și să ne comunicaţi la acest subiect!
Answer (14 Apr 2026, 18:40):
Caiet de sarcini №2-1-3 Р. 201 — În acest punct trebuie să luați în considerare costul întrerupătorului de sarcina BH-32 3P 32A. Textul — Dispozitiv sau aparat demontat inainte de transportare ( automate ) si codul de resurse — poate fi eliminat
Date:
9 Apr 2026, 09:23
Question's name:
2-1-6 SPA
Question:
Pozitia 5 care model de cablu este corect din resursa sau descriere. Deoarece sunt 2 diferite.
Answer (9 Apr 2026, 10:31):
Poz. 5 — corect din descriere — Коммутационный шнур F/UTP cat. 6a 1 Гбит/с, неэкранированный RJ-45 - RJ-45, длина 1 м
Date:
9 Apr 2026, 11:43
Question's name:
2-1-7
Question:
Pozitia 27 in descriere Set montare DN 40 (pentru contor de energietermica) dar la resursa DN 20 ??? La pozitia 28 RpIC28A la resurasa Montare Set montare DN 40 clarificati daca aceste 2 pozitii au tagndenta una cu alta si daca trebuie sa aplicat pret la ambele resurse sau la resursa Montare Set montare DN 40 este doar infomativ si nu aplicam pret ?
Answer (16 Apr 2026, 10:59):
Bună ziua. Pozitia 27 in descriere Set montare DN 40 (pentru contor de energietermica) - la resurs corect este Set montare DN 40.
Date:
9 Apr 2026, 11:44
Question's name:
2-1-7 adaugator la intrebarea 9 apr 2026, 11:43
Question:
Aceeasi situatie cu pozitia 31 si 32 . Rugam clarificare
Answer (14 Apr 2026, 18:42):
Caiet de sarcini №2-1-7 Nr. 2-1-7 Incalzire poz.25 IC40B varianta corecta: "Bratara fixare d 50". Nr. 2-1-7 Incalzire poz.35 varianta corecta : Robinet sferic cu filet FF dn 50 PN25 Nr. 2-1-7 Incalzire poz.33 2035-07 varianta corecta : Robinet sferic sub sudura DN 50 Pozitia 6 Radiatoare din bi-metal correct 10sectii a cite 121 buc, total 1210 sectii Nr. 2-1-7 Incalzire poz.19 IC38E varianta corecta: Cot PPR 45 d=50
Date:
9 Apr 2026, 12:53
Question's name:
Clarificare 2-1-7
Question:
Din analiza caietului de sarcini constatam ca la pozitiile 28, 32, 36, 38, 47, 51 la resursele unde este scris Montare...''material'' nu se aplica pret si va ramaine cu 0 (zero) Confirmati daca este corect?
Answer (16 Apr 2026, 10:59):
Bună ziua. La pozitiile 28, 32, 36, 38, 47, 51, Montarea ( pretul 0).
Date:
9 Apr 2026, 14:20
Question's name:
anunti
Question:
G,aranția de buna execuție 5% din suma contractului fără TVA,Garanția pentru ofertă, DA, cuantumul 1 % din suma totală a ofertei.Garanția de bună execuție a contractului, DA, cuantumul 5% din suma totală a contractului fără TVA.nu este clar care si pentru ce
Answer (10 Apr 2026, 16:34):
Articolul 68, legea 131/2015
Date:
9 Apr 2026, 17:43
Question's name:
Proiect de executie
Question:
Buna ziua, incarcati va roc proiectul de executie capitolul SA
Answer (14 Apr 2026, 15:07):
Proiectul a fost plasat în SIA RSAP
Date:
9 Apr 2026, 18:04
Question's name:
Ferestre
Question:
Cap. 9.2. In denumirea capitolului este scris Ferestre profil din aluminiu 4 camere cu BARA TERMICA cu geam termopan Low-E/4S, ceea ce presupune ferestre din profile cu punte termica, dar in textul normei este indicat simplu Ferestre din aluminiu. Explicati va rog sunt totusi ferestre din aluminiu cu punte termica, sau ferestre din aluminiu simple pentru ca sunt 2 materiale cu diferenta mare de pret
Answer (10 Apr 2026, 09:42):
a deviz 2-1-1 . Ferestre profil din aluminiu 4 camere cu bara termica cu geam termopan Low-E-/4S Bloc A,Bloc B.Galeree (vezi descriere in F1 la capitoli 9.2,10.2,11.2)
Date:
10 Apr 2026, 09:20
Question's name:
Caiet de sarcni 2-1-7
Question:
Buna ziua, solicitam clarificari referitor la pozitiile 79 si 80. Ce prevad aceste pozitii ? De ce nu sunt incluse la un capitol aparte ca Lucrari de Reglare -Demarare unde recapitulatiile se calculeaza altfel CI=Sbx60%/100%
Answer (14 Apr 2026, 18:35):
Caiet de sarcni 2-1-7 In pozitii 79, 80 sint prevazute costuri pentru PIF de la furnizor in vederea confirmarii garantiei la utilaj, si care sint comerciale(de piata) si nu se calculeaza ca lucrari de demarare reglare. De exemplu la ROMSTAL- PIF pentru centrale murale este de 800MDL si fara achitarea acestei sume nu se semneaza garantia la utilaj.
Date:
10 Apr 2026, 13:37
Question's name:
Răspuns (10 apr 2026, 09:42) a deviz 2-1-1 . Ferestre profil din aluminiu 4 camere cu bara termica cu geam termopan Low-E-/4S Bloc A,Bloc B.Galeree (vezi descriere in F1 la capitoli 9.2,10.2,11.2)
Question:
Profilele din aluminiu pentru tamplarie exista doar de 2 tipuri: simplu si cu bariera termica. Cel simplu se foloseste la interior sau in incaperi neincalzite, cel cu bariera termica se foloseste pentru exterior(ferestre si usi de intrare) deaorece ofera izolare termica si previne aparitia condensului. Profile cu 4, 5 si mai multe camere exista doar din PVC! La Dvs in text este indicat jumatate de caracteristici pentru profile de aluminiu si jumatate pt profiluri PVC, concretizati va rog la proiectant, sau consultati un specialist si indicati concret pentru ce tip de profile de prezentat oferta
Answer (14 Apr 2026, 18:37):
Ferestre și uși exteriori (profil din aluminiu cu bara termiă cu geam termopan Low-E-/4S) Bloc A,Bloc B.Galerie
Date:
10 Apr 2026, 13:51
Question's name:
Anunti
Question:
Vă rugăm să revizuiți și să corectați devizul 2-1-7, întrucât s-au identificat multiple abateri, iar codurile sunt combinate incorect dintr-o poziție în altă poziție.
Answer (16 Apr 2026, 10:58):
Devizul 2-1-7 (ajustat) se anexează în SIA RSAP
Date:
17 Apr 2026, 08:39
Question's name:
Răspuns (16 apr 2026, 10:58): Devizul 2-1-7 (ajustat) se anexează în SIA RSAP
Question:
Publicati la fel formularul desfasurat al CS 2-1-7 ajustat
Answer (17 Apr 2026, 17:25):
Formatul desfășurat a fost publicat
Date:
17 Apr 2026, 08:45
Question's name:
Răspuns (14 apr 2026, 18:40): Caiet de sarcini №2-1-3 Р. 201 — În acest punct trebuie să luați în considerare costul întrerupătorului de sarcina BH-32 3P 32A. Textul — Dispozitiv sau aparat demontat inainte de transportare ( automate ) si codul de resurse — poate fi eliminat
Question:
Pentru claritate rugam confirmarea pentru pozitia 201 , deci trebuie sa stergem resursele Muncitor si Suruburi de constructie cu piulite si saibe, ulterior adaugam Выключатель нагрузки ВН-32 3P 32А. ?
Answer (19 Apr 2026, 16:59):
Bună ziua. În acest punct trebuie să luați în considerare costul întrerupătorului de sarcina BH-32 3P 32A. Textul — Dispozitiv sau aparat demontat inainte de transportare ( automate ) si codul de resurse — poate fi eliminat.
Date:
17 Apr 2026, 16:23
Question's name:
Devizul 2-1-7 (ajustat)
Question:
Publicati va rugam si formular desfasurat la devizul actualizat. Plus in devizul actualizat la pozitia nr. 31 - Set montare DN 1" cantitatea este 0 (zero) dar anterior era catitatea 1 buc. Asa este norect?
Answer (17 Apr 2026, 17:27):
Devizul ajustat desfășurat a fost publicat. Cum este indicat așa și luați în considerație.
Only authorized platform users may ask questions during the clarification period.