UPS 15-20 kVA
to 24.02.2025 16:00
to 28.02.2025 16:00
Supplier technical support:
(+373) 79999801
This procedure is carried out without auction. Your offer is final and must contain the entire list of required documents.
> 150%, 200ms For installation on IT Rack
UPS output power 11-15-20 kVA (SW upgradable)
Nominal input voltage 380V/400V/415V
Input voltage range without battery discharge depending on load % 173-498 V
Nominal input frequency 50/60 Hz
Input frequency range 40-70 Hz
Input power factor at full load (kw/kva) 0,99
THD at full linear load (THDI%) ≤3 %
Nominal output voltage 380/400/415 or 220/230/240 V selectable at installation
Inverter overload capacity at 25°C 105% for 60 min; 125% 5min; 150% for 1 min, > 150%, 200ms
Double conversion efficiency 96,20%
ECO Mode Efficiency 99%
By-pass voltage tolerance -50
By-pass frequency tolerance +/-10%
Battery blocks per string 24-40
Battery charger min. current 12 A
Parallel connection of UPS Up to 4 units
Noise at 1 m (dBA) ≤59 dBa
Ventilation Face to back
Protection IEC (60529) IP20
1.2 UPS configuration:
UPS back-up time at 100% load 12 KW and PF =1 8 min.
Battery type/service life AGM/10 years
Battery voltage temperature compensation kit Included
Room temperature and relative humidity sensor Included
Ethernet interface for monitoring Protocol SNMP
Sliding kit for UPS and battery YES
By-pass Electronic and Manual
Input POD Protection CB/Input/ Output/ Battery, By-pass switch
Load power distribution YES
Rack/Tower design delivered with rack mount: UPS/ input POD/ Load distribution dimension/Battery sets accessories 3U/3U/3U/6U(4U)
General standards EN/IEC/AS 62040-1, EN/IEC/AS 62040-2, CEI EN 62040-3 VFI-SS-111
The offers of the participants are available below, you can view the documents for the offers by clicking on the folder icon.
Based on the Working Group Decision, the selection of a winner requires:
1) Choose winner by clicking the button "Winner.”
2) Отправить в течении 3 дней на почту AAP bap@tender.gov.md отсканированное решение рабочей группы.
4) After choosing the winner, press the button: "Confirm"..
Synotech Global Services SRL
Entegra plus
Documents such as "Qualification Documentation", "financial proposal" and "Illustration" will be browseable for all only after your offer has been placed in "pending" status.