1
Enquiry period
with 17.07.2024 15:27
to 10.09.2024 10:00
2
Bidding period
with 10.09.2024 10:00
to 04.10.2024 08:00
3
Auction
with 07.10.2024 13:00
to 07.10.2024 15:14
4
Evaluation

5
Contract

Status Evaluation
Estimated value without VAT 43 450 153,71 MDL
Period of clarifications: 17 Jul 2024, 15:27 - 10 Sep 2024, 10:00
Submission of proposals: 10 Sep 2024, 10:00 - 4 Oct 2024, 8:00

Supplier technical support:

(+373) 79999801

Servere și sisteme de stocare (perioada 2024-2025)

Information about customer
Fiscal code/IDNO
Address
2012, MOLDOVA, mun.Chişinău, mun.Chişinău, str. Puskin, 42
Web site
---
The contact person
Full name
Galina Uzun
Contact phone
022-50-48-37
Purchase data
Date created
17 Jul 2024, 15:27
Date modified
6 Sep 2024, 14:30
Achizitii.md ID
21260230
CPV
48820000-2 - Servere
Type of procedure
Open tender
Award criteria
The lowest price
Funding sources
Documents of the procurement procedure
Declaratie.doc
Bidding Documents
Declaratie.doc
17.07.24 15:27
Anexa nr. 24 - model contractului servere.signed.pdf Anexa nr. 24 - model contractului servere.signed.pdf
Bidding Documents
Anexa nr. 24 - model contractului servere.signed.pdf
17.07.24 15:27
AGE-3011-555-11072024-ASP.semnat.pdf AGE-3011-555-11072024-ASP.semnat.pdf
Bidding Documents
AGE-3011-555-11072024-ASP.semnat.pdf
17.07.24 15:27
Anexa la Anunțul de participare.signed.pdf Anexa la Anunțul de participare.signed.pdf
Technical Specifications
Anexa la Anunțul de participare.signed.pdf
17.07.24 15:27
DUAE.docx
Bidding Documents
DUAE.docx
17.07.24 15:27
DUAE.signed.pdf DUAE.signed.pdf
Bidding Documents
DUAE.signed.pdf
17.07.24 15:27
Declaratie.signed.pdf Declaratie.signed.pdf
Bidding Documents
Declaratie.signed.pdf
17.07.24 15:27
Anexa la Anunțul de participare.docx
Technical Specifications
Anexa la Anunțul de participare.docx
17.07.24 15:27
Anexa la documentatia standard Modificat~3.doc
Bidding Documents
Anexa la documentatia standard Modificat~3.doc
6.09.24 14:17
Anexa la documentatia standard Modificat.signed.pdf Anexa la documentatia standard Modificat.signed.pdf
Bidding Documents
Anexe la documentatia standard.signed.pdf
6.09.24 14:17
anunt modif.signed.pdf anunt modif.signed.pdf
tenderNotice
Anunt de participare.signed.pdf
6.09.24 14:17
Date:
18 Jul 2024, 15:24
Question's name:
Lot 5: Clarificare cerinta
Question:
Va rugam sa clarificati cerinta "- 100% full capacity reading;" ce presupune, si la ce se refera?
Answer (6 Sep 2024, 13:38):
Această cerință este complet legată de cele 2 cerințe indicate ]n specificații tehnice mai sus în raport cu eventuale defecțiuni ale controlerelor: [ ...- lack of decrease in the required equipment efficiency in the event of a failure of half of the controllers; - lack of decrease in the required performance in the event of a failure of half of the controllers; ] Astfel, dacă jumătate dintre controlere eșuează, tot spațiul (100%) și resursele (100%) ar trebui să fie disponibile pentru citire. În consecință, cerința în cauză urmează să fie tratată ca - 100% de capacitate de citire cerută trebuie să fie disponibilă pentru utilizare cu menținerea performanței, a tuturor funcționalităților, și altor specificații funcționale stabilite în documentație. Nu este acceptată nici o degradare, cu excepția componentelor care vor fi înlocuite în conformitate cu cerințele de garanție stabilite.
Date:
18 Jul 2024, 15:29
Question's name:
Lot 4: Clarificare cerinta - Capacity
Question:
Cu referire la cerintele fata de capacitate va rugam sa clarificati: 1. De ce 600TB usable se pune accent pe RAID6, pe cind pentru sisteme All-Flash se recomanda RAID-grupe ce permit iesire din functiune a 3 discuri? 2. De ce se solicita 600TB usable, pe cind volum usable depinde de cantiatea de discuri in grup? Unii vendori pot trisa pe faptul ca sa declare grupuri mari, dar defapt recomandabil raid-grupe din numari mai mic de discuri, in dependenta de incarcatura. Va rugam sa stabiliti criterii egale pentru toti, cum se va calcula, sau solicitati express nr de discuri. 3. Se planifica extindere pe viitor cu NVME? sau se admite si SAS?
Answer (6 Sep 2024, 13:38):
Presupunem, că întrebările adresate sunt în raport cu Lotul 5, la lotul 4 nu se regăsesc aceste detalii în cerințele tehnice. 1. Diferiți vânzători și producători pot oferi capacități de spațiu de stocare pentru date în moduri diferite, exact în contextul faptului pentru a nu limita participarea mai multor ofertanți cu soluții de la diferiți producători, și pentru a permite și de a ține cont de majoritatea tehnologiilor moderne disponibile și folosite în prezent, parametrul capacității de stocare a fost indicat cu valoarea de 600TB în formă marcată(in marked form) ca spațiu util. Reiterăm cele indicate în documentație - Cerința față de parametrul de stocare este minimă și obligatoriu. Specificațiile hardware furnizate urmează să fie prezentate sub forma de: număr de discuri, spațiu RAW, spațiu de rezervă (spare) și spațiu utilizabil după partiţionarea discurilor în RAID6. 2. Pentru sisteme de stocare de tip full flash, discurile nu sunt întotdeauna criteriul principal sau componente ale echipamentului pe care se poate baza ca criteriu principal, motiv pentru care nu a fost indicat numărul de discuri. Potențialul ofertant trebuie să indice în oferta sa ce va utiliza și în ce cantitate pentru a corespunde cu cerințele tehnice stabilite. Reiterăm cele indicate în documentație - Cerința față de capacitatea parametrului de stocare este minimă și obligatorie. 3. Sistemele de stocare care fac obiectul achiziției sunt preconizate fără planificarea extinderii pe viitor. Pentru lotul nr.5, SAS nu este acceptat, a se consulta cerința stabilită pentru lotul nr.5: ”Type Drives: NVMe/Flash;”
Date:
18 Jul 2024, 15:31
Question's name:
Lot 5: Clarificare cerinta - NICs included:
Question:
Va rugam sa clarificati, modul in care se va expune storage-ul catre servere, daca se solicita doar 2 interfete FC?
Answer (6 Sep 2024, 13:39):
Pentru orchestrarea tuturor echipamentelor achiziționate se vor folosi echipamente de comutare FC(fiber chanel), în plus, o parte din infrastructura pasivă este deja pregătită și funcțională (interconectarea între camerele serverelor), în consecință, acest tip de interfață stabilit în documentație ca cerință tehnică obligatorie este o prioritate. Cel puțin 2 interferețe FC pentru fiecare controller, astfel ca toate controlerele trebuie să conțină cel puțin 2 porturi SFP cu module activate. Comutatoarele FC nu sunt în scopul prezentei proceduri de achiziții și vor fi achiziționate prin proceduri de achiziții publice separate.
Date:
18 Jul 2024, 16:59
Question's name:
Lot 5 - Availability
Question:
Ce presupune aceasta cerinta: "The equipment must allow to safely disable the device that does not cause user loss."?
Answer (6 Sep 2024, 13:39):
A fost admisă o eroare tehnică la redactarea cerințelor prin omisiunea cuvântului ”data”, astfel în documentația de atribuire au fost aplicate modificări de corectare pentru Loturile 5, 6 și 7. Modificările după cum urmează: din ”The equipment must allow to safely disable the device that does not cause user loss.” în ”The equipment must allow to safely disable the device that does not cause user data loss.”
Date:
18 Jul 2024, 18:00
Question's name:
Lot 5 - Cluster requirement and replication
Question:
Aceasta cerinta limiteaza concurenta, deoarece fiecare solutie de stocare are propria sa tehnologie de sincronizare. Va rugam respectuos sa fie eliminata: "Provide all hardware components necessary to implement the functionality of replication with utilization of FC protocol."
Answer (6 Sep 2024, 13:40):
Pentru orchestrarea tuturor echipamentelor achiziționate se vor folosi echipamente de comutare FC(fiber chanel), în plus, o parte din infrastructura pasivă este deja pregătită și funcțională (interconectarea între camerele serverelor), în consecință, acest tip de interfață stabilit în documentație ca cerință tehnică obligatorie este o prioritate și nicidecum nu poate fi considerat ca o constrângere ”proprietară” specifică unui singur furnizor(producător), interfețele FC sunt disponibile și pot fi folosite de majoritatea producătorilor care furnizează soluții de nivel Enterprise. Cel puțin 2 interferețe FC pentru fiecare controller, astfel ca toate controlerele trebuie să conțină cel puțin 2 porturi SFP cu module activate. Comutatoarele FC nu sunt în scopul prezentei proceduri de achiziții și vor fi achiziționate prin proceduri de achiziții publice separate.
Date:
23 Jul 2024, 09:06
Question's name:
Lot 5,6,7
Question:
”Capacity: min. usable space …”. Va rugam sa confirmați ca este necesar “usable space” după calcularea necesitaților pentru RAID6. Sau totuși este necesar spațiu “efectiv garantat de producător” (după deduplicare si compresare) chiar dacă este consumat 100% de “usable space” fără pierderea de performanta?
Answer (6 Sep 2024, 13:41):
Spațiu total necesar și disponibil pentru utilizare este de tip „usable space” cu nivel de redundanță minim echivalentă cu RAID6, a se consulta cerințele tehnice stabilite pentru fiecare lot în parte.
Date:
23 Jul 2024, 09:07
Question's name:
Lot 1,2,3,4
Question:
Dacă pentru servere sunt cerute 2 disk-uri (sunt dedicate OS) si RAID Controller, putem sa propunem soluția pentru OS de tip “boot device” cu discuri redundante (RAID1), cu capacitatea si parametrii nu mai slabe de cele cerute?
Answer (6 Sep 2024, 13:42):
Da, sunt acceptate soluții alternative cu suficientă redundanță, capacitate și parametrii cu valori mai avantajoase de cele minim solicitate și indicate conform documentației de concurs.
Date:
23 Jul 2024, 12:34
Question's name:
CERINȚE OBLIGATORII PENTRU PRESTAREA GARANȚIEI ȘI A SERVICIILOR DE SUPORT(DESERVIRE) A ECHIPAMENTELOR – ENTERPRISE SERVER (tip X) / SISTEME DE STOCARE (Full flash tip 1 / SAS SSD tip 2 / SAS SSD tip 3) 1. Condiții Generale:
Question:
Acceptanța prin semnarea actului de predare-primire a bunurilor și a facturii fiscale de către Cumpărător este condiționată de îndeplinirea cerinței privind livrarea bunurilor în completarea deplină a setului echipamentului(nemijlocit dispozitivele computaționale – Enterprise server (tip X) / Sisteme de stocare (Full flash tip 1 / SAS SSD tip 2 / SAS SSD tip 3), cablurile de conexiune, cabluri de alimentare de la surse de energie electrică, șine de montare în rack: șine cu extracție completă, etc.) în strictă conformitate cu documentația de atribuire și a contractului prevăzute pentru bunurile livrate. Furnizorul va fi responsabil pentru implementarea completă a sistemului computațional Enterprise server(tip X) / Sisteme de stocare(Full flash tip 1 / SAS SSD tip 2 / SAS SSD tip3), inclusiv serviciile și manopera aferente: livrarea, despachetarea, instalarea, conectarea, configurarea, punerea în funcțiune și alte servicii relevante, inclusiv și instruirea personalului Cumpărătorului vor fi incluse în prețul bunurilor. Suplimentar: Lotul nr.5 Sisteme de stocare Cluster requirement and replication: - The equipment must have the functionality of synchronous replication enabling the creation of the Active-Active cluster from both equipments (between two server rooms located in separate buildings) and provide all hardware components necessary to implement the functionality of replication with utilization FC protocol. Va rugam sa clarificati mentiunea de ‘cablurile de conexiune’, ‘conectarea, configurarea, punerea în funcțiune’ si ‘provide all hardware components’ in cerinte. Din cele scrise subintelegem livrarea la cheie cu punerea in functiune a echipamentului solicitat. Sant de asemeni indicate 2 camere de servere in locatii diferite. In acelasi timp in cerinte nu avem explicit indicate cantitatile, tipurile si lungimea cablurilor de comunicare cu schemele de amplasare in rack si pe locatii. De asemeni nu sant cerute echipamentele active necesare pentru comunicatii, switches, SAN switches si altele. Pentru a intocmi corect oferta si lansarea acestui proiect complex aceste date sant vitale.
Answer (6 Sep 2024, 13:43):
Echipamentele active pentru comunicații, switches, SAN switches și alte echipamente pasive de telecomunicații nu sunt în scopul prezentei proceduri de achiziții și vor fi achiziționate prin proceduri de achiziții publice separate. În documentația de atribuire nu este expres indicată lungimea cablurilor, astfel lungimea cablurilor electrice (cu conexiunea c13 PDU) trebuie tratat ca fiind limitată de lungimea în cadrul unui dulap de comunicații, iar lungimea cablurilor de comunicații (date) - 5m. Nu este în scopul ofertanților să asigure interconectarea adițională fizică și logică a camerelor de servere, infrastructura tehnologică necesară fiind deja realizată. Interconectarea echipamentelor va fi realizată prin interfețele specificate în documentația de atribuire publicată, a se consulta cu atenție cerințele stabilite la loturile 1, 2, 3 și 4: ”NICs included”.
Date:
23 Jul 2024, 12:52
Question's name:
Procedura electronică de licitare a început: 17/07/2024, 15:27 Ultima actualizare: 18/07/2024, 15:24
Question:
Va rugam sa precizati scopul si care a fost actualizarea efectuata, deoarece conform platformei mtender nu sunt inregistrate modificari in documentatia de atribuire, anunt sau anexe. Multumim.
Answer (23 Jul 2024, 14:37):
Documentația de atribuire nu a fost modificată și republicată pe platforma electronică. Data privind ultima actualizare de 18/07/2024, 15:24 a fost generată de platformă respectivă, dar nu de către autoritatea contractantă.
Date:
23 Jul 2024, 13:05
Question's name:
Lot 5 si 6 clarificare - The equipment must enable deduplication functionality for volumes accessible at block level (iSCSI/FC LUN), file level volum
Question:
Lotul nr. 5 Sisteme de stocare Full flash tip 1 si Lotul nr. 6 Sisteme de stocare SAS SSD tip 2, la capitolul Supported protocols: sunt cerute obligatorii, - FC, - iSCSI; in corelae cu cerinta de functionalitate pentru Deduplication: - The equipment must enable deduplication functionality for volumes accessible at block level (iSCSI/FC LUN), file level volumes and globally for each system, pa cand la capitolul conexiuni minime incluse NICs included: Min. x 1GE management; min. 2 x 32Gb FC SFP+, identical, with SFP+ SR MM module included. sunt indicate doar de tip FC. Va rugam sa explicati necistate includerii unor fucntionalitati ce nu pot fi utilizate in aceast sistem? este scopul limitarii potentialelor produse or aceasta cerinta este de prisor. solciitam eliminarea cerintei in conditiile in care ea este de prisor. multumim.
Answer (6 Sep 2024, 13:48):
Conform documentației de atribuire publicate, toate cerințele sunt Minime și Obligatorii, astfel vor fi acceptate ofertele pentru sisteme de stocare care suporta obligatoriu protocoale la nivel de block (iSCSI / FC) pentru a asigura flexibilitatea și compatibilitatea cu diferite tipuri de infrastructuri de rețea, cu posibilități de compresare și deduplicare. Sintagma „file level” a fost eliminată din cerințele tehnice, documentația a fost modificată în consecință. Cerința de a susține funcționalitatea de deduplicare la nivel de bloc (iSCSI/FC) are ca scop optimizarea utilizării spațiului de stocare și îmbunătățirea eficienței și asigurarea redundanței sistemului per ansamblu. Nici o cerință sau parametru stabilite în documentația de atribuire nu are sarcina de a limita potențialii participanți în a oferi bunuri cu capacități tehnice și funcționale mai avantajoase decât cele stabilite în documentație ca cerințe Minime care cumulativ trebuie să fie asigurate de echipamentele ce vor fi propuse.
Date:
23 Jul 2024, 13:14
Question's name:
Lot 5 si 6 Performance requirement
Question:
Lot 5 si 6 Performance requirement Sequential and random I/O; va rugam sa completați sarcina tehnica cu raportul de distribuție care este necesar?
Answer (6 Sep 2024, 13:49):
Pentru cerințele de performanță - IOPs specificate ca cerințe minime în documentația de atribuire pentru fiecare lot fiind indicate valori minime diferite, operatorii economici interesați vor prezenta întru susținerea afirmațiilor de corespundere - specificațiile și detaliile tehnice ale bunurilor ce vor fi propuse, în raport cu cerințele minime stabilite.
Date:
23 Jul 2024, 15:32
Question's name:
Clarificare pe distribuirea cantitativa si conectivitate echipamentelor
Question:
in contextul in care la cerintele obligatorii Furnizorul se obligă sa asigura tot necesraul privitor la serviciile de livrare, montare, instalare, configurare si inclusiv la capitolul cablurile de conecțiune, cabluri de alimentare de la surse de energie electrică, șine de montare în rack: șine cu extracție completă, etc.) în strictă conformitate cu documentația de atribuire și a contractului prevăzute pentru bunurile livrate.Loturile (1-4) in total 15 unitati Servere si loturile 5-7 sisteme de stocare, va rugam sa indicati exprez care va fi distributia cantitatva a acestora? De asemenea pentru a permite agentilor econiomici posibilitate de estimare corecta a tuturor cele obligate la capitolul dat este necesar sa descrieti schema conexiunilor disponibile precum si spatiul in Rack-uri, Susrse de alimnetare UPS, si tipul conexiunilor necesare?
Answer (6 Sep 2024, 13:53):
NOTA: Continuare raspuns din 23.07.2024, ora 13:14 (intrebarea de mai sus)Astfel pentru evaluarea corectă de corespundere cu nivelurile minime de performanță, ofertanții vor prezenta instrumentul corespunzător de la producătorul sistemului de stocare (denumirea instrumentului, referință/web-link) pentru evaluarea și verificarea de către Autoritatea contractantă conform parametrilor, inclusiv și raportul de distribuție la care se face referință în prezenta întrebare, stabiliți în documentație: ”IOPS are calculated according to the following principle: - Read/write ratio - 70/30; - Block size - 16K/32K/64K; - Sequential and random I/O; - Delay – 0.001 s;” Astfel, performanța echipamentelor ce vor fi propuse, pe bază de IOPs urmează să fie calculate conform următorului principiu: - Raport de citire/scriere aleatorie - 70/30, dimensiune bloc - 16K, latență – max 0,001 s; - De asemenea, trebuie să fie prezentate IOPs secvenţiale, GB/s, latenţă. Opțional, se vor prezenta în ofertă - Performanță aleatorie pentru dimensiunea blocului - 32K/64K. Răspuns la solicitarea dată (23.07.2024, ora 15:32):Camerele serverelor gestionate de ASP sunt echipate cu toate echipamentele necesare de comutare pasivă, sisteme de gestionare a energiei, surse de alimentare neîntreruptibile, sisteme de răcire, etc. Echipamentele active pentru comunicații, switches, SAN switches și alte echipamente pasive de telecomunicații nu sunt în scopul prezentei proceduri de achiziții și vor fi achiziționate prin proceduri de achiziții publice separate. În documentația de atribuire nu este expres indicată lungimea cablurilor, astfel lungimea cablurilor electrice (cu conexiunea c13 PDU) trebuie tratat ca fiind limitată de lungimea în cadrul unui dulap de comunicare, iar lungimea cablurilor de comunicații (date) - 5m. La momentul livrării echipamentelor și punerii acestora în funcțiune de către furnizorii ce vor fi desemnați câștigători, în conformitate cu cerințele stabilite în Anexa la anunțul de participare, spațiul în rafturi și toate conexiunile necesare vor fi asigurate în strictă conformitate cu cantitățile de echipamente prevăzute în documentația de atribuire. Astfel că furnizorii vor instala echipamentele în „slot-urile” deja pregătite în rack-urile de servere disponibile. Interconectarea echipamentelor va fi realizată prin interfețele specificate în documentația de atribuire publicată, a se consulta cu atenție cerințele stabilite pentru toate loturile: ”NICs included”. Din considerente de securitate a informației, aceste detalii(scheme/diagrame de conexiune ori alte informații tehnice de acces și uz restricționat) nu pot fi expuse public la dispoziție în cadrul prezentului format de întrebări de clarificări pe platforma MTender, și vor fi coordonate nemijlocit cu operatorii economici ce vor fi desemnați câștigători la finalizarea procedurii de achiziție și doar ulterior încheierii contractelor, precum și semnării acordurilor de confidențialitate prevăzute corespunzător.
Date:
25 Jul 2024, 15:42
Question's name:
Lotul nr.5 - 7
Question:
NICs included: Min. x 1GE management; min. 2 x 32Gb FC SFP+, identical, with SFP+ SR MM module included. Cerinta de 2x 32GB FC pentru conexiunea de Storage vine in contradictie cu cerintele severe inaintate pentru disponibilitate (availability), eficienta si redundanta. Schema clasica de inalta disponibilitate care elimina punctul unic de caderi (single point of failure) si permite agregarea sau balansarea incarcaturii fluxului de date este asa numita schema de Multipathing care presupune conectarea prin minimum a doua cai a fiecarui controller si nu prin una. -------------- Dupa cum la echipamentele de Servere si Storage sant cerute porturi FC se subintelege ca conexiunea intre ele va fi realizata cu ajutorul infrastructurii SAN care necesita SAN Switches. Aceste comutatoare nu sant cerute. In asa mod putem intelege ca infrastructura necesara pentru aceste conexiuni va fi asigurata de catre Beneficiar. Insa diferiti producatori au diverse realizari de echipamente iar numarul de porturi de conectare pentru 1x Storage poate fi si 2x sau 16x si chiar mai multe. Aceasta poate duce la o situatie imprevizibila si care poate pune in pericol realizarea proiectului. Acceasi problema se refera si la spatiul in Rack pentru echipamentul solicitat va rugam sa clarificati.
Answer (6 Sep 2024, 13:59):
Pentru orchestrarea tuturor echipamentelor achiziționate se vor folosi echipamente de comutare FC(fiber chanel), în plus, o parte din infrastructura pasivă este deja pregătită și funcțională (interconectarea între camerele serverelor), în consecință, acest tip de interfață stabilit în documentație ca cerință tehnică obligatorie este o prioritate. Cel puțin 2 interferețe FC pentru fiecare controller, astfel ca toate controlerele trebuie să conțină cel puțin 2 porturi SFP cu module activate. Echipamentele active pentru comunicații, switches, SAN switches și alte echipamente pasive de telecomunicații nu sunt în scopul prezentei proceduri de achiziții și vor fi achiziționate prin proceduri de achiziții publice separate. Dacă soluția ofertată va avea o realizare specifică, toate componentele necesare trebuie să fie indicate în ofertă și prezentată schema de realizare pentru a evita pericole la desfășurarea și implementarea proiectului.
Date:
25 Jul 2024, 15:44
Question's name:
Lotul nr.5 - 7(01)
Question:
Form Factor: min. 2U Rack mounting: rails with full extraction included; Nu este relevanta cerinta de ‘rails with full extraction’ din cauza ca echipamentele de storage nu au deservirea componentelor din partea de sus ca si serverele si folosesc din aceasta cauza alt tip de montare (rails). va rugam sa corectati in sarcina tehnica aceasta cerinta pentru ca ea nu poate fi indeplinita de nici un producator.
Answer (6 Sep 2024, 14:01):
Se acceptă. Pentru Loturile 5, 6, 7, vor fi aplicate modificări prin excluderea sintagmei ” : rails with full extraction” după cum urmează: din ”Form Factor: min. 2U Rack mounting: rails with full extraction included;” în ”Form Factor: min. 2U Rack mounting included;”
Date:
25 Jul 2024, 15:49
Question's name:
Lotul nr.1 - 4(02)
Question:
Form Factor: max. 2U, Rack mounting: rails with full extraction included; Power supplies included: min. 2 hot-plug PSU with support for 1+1 redundancy with power cables c13- c14(0.6 m); Cerintele de ‘rails with full extraction’ impreuna cu ‘power cables c13- c14(0.6 m)’nu sant adecvate sau rezonabile. Luand in considerare faptul ca serverele solicitate au o adincime de mai mult de 0.6m si adancimea dulapului (Rack) este de asemeni mai mare de 0.6m (poate fi si mai mare de 0.8m) in momentul deservirii/ mentenantei exista pericol de deconectarea cablului de alimentare sau deteriorare. Pentru a evita aceste probleme se recomanda un cablu de alimentare mai lung si de asemeni un Cable Management Arm pentru organizarea corecta a cablurilor de tensiune si comunicatii. Va rugam sa revizuiti aceasta cerinta pentru a permite ofertantilor oferirea unor specificatii corespunzatoare. Reamintim, ca conform Articolul 37 Legea achizitii publice in vigoarea, (1) Specificațiile tehnice ale bunurilor, lucrărilor şi serviciilor solicitate de autoritatea contractantă vor reprezenta o descriere exactă şi completă a obiectului achiziţiei, astfel încît fiecare cerinţă şi criteriu, stabilite de autoritatea contractantă, să fie îndeplinite.si (4) Specificațiile tehnice ale obiectului achiziţiei trebuie să corespundă cerinţelor autorităţii contractante privind calitatea, eficienţa, testarea, securitatea, dimensiunile, simbolurile, terminologia, ambalajul, modul de transportare, marcarea, etichetarea, procesele şi metodele de producere, precum şi procedeele de determinare a conformităţii lui cu cerinţele din documentația de atribuire.
Answer (6 Sep 2024, 14:02):
Cerința menționată privind lungimea cablului de 0.6 m este minimă și obligatorie. Nici o cerință sau parametru stabilite în documentația de atribuire nu are sarcina de a limita potențialii participanți în a oferi bunuri cu capacități tehnice și funcționale, precum și parametri fizici(ca de exemplu – luingimea cablurilor) mai avantajoase decât cele stabilite în documentație ca cerințe Minime care cumulativ trebuie să fie asigurate de echipamentele ce vor fi propuse. Dacă pentru soluția “full extraction” sunt necesare cabluri de o lungime mai mare de cele indicate în cerințe, operatorii economici interesați urmează să le includă în oferta tehnică cu specificarea tuturor detaliilor (inclusive de exmplu – Cable management arm, etc) în conformitate cu normele de securitate stabilite de producători. În consecință putem confirma că Autoritatea contractantă le va accepta ca conforme la etapa de evaluare și nicidecum nu va aplica descalificarea pe acest criteriu.
Date:
26 Jul 2024, 08:55
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7:“The equipment must be working in Symmetric Active-Active (not Alua) mode, which means that in the case of 100% utilization, ensures: - obtaining high availability at 99,9999%;”
Question:
Clarification Question: Please accept also storage equipments that have ALUA with the condition that the cache of the preferred controller is mirrored with his controller pair and in case the preferred controller is not available, the IOs from host are automatically routed via the second controller. This type of access is considered active-active controllers with a dedicated preferred controller for host access. More, this type of active-active solution, reduces the latency of the IOs that are coming from host because each host will access his data via his preferred controller (not overloading one of the controllers of the solution). In this case, access from hosts will be balanced between the two controllers of the solution.
Answer (6 Sep 2024, 14:03):
Contracting authority confirms the acceptance of solutions that have ALUA based storage. As consequence, the tender documentation for Lots 5, 6 and 7 was modified by removing the phrase "(not Alua)" from: [The equipment must be working in Symmetric Active-Active (not Alua) mode,...] to [The equipment must be working in Symmetric Active-Active mode,...]. Ple note to consider that storage architecture that will be offered by the bidders need to assure that in the case of failure of the controller, write cache of the surviving controller/controllers is still in use and protected. Solutions where write cache is deactivated, or used without cache mirroring or no other protection mechanism are in place are not accepted!
Date:
26 Jul 2024, 08:58
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7:“ “lack of decrease in the required performance in the event of a failure of half of the controllers;”
Question:
Clarification Question: All storage equipments use both controllers to serve IOs to the hosts during normal usage. In case one controller fails or half of the installed controllers are failing it will mean that the remaining controller or controllers (depending on the total number of installed controllers) will take the load from the failed ones. Taking into consideration the above, in order to have same performance with one controller or half of the installed controllers, that will mean that the proposed storage should be capable of sustaining : - Lot nr. 5 : 1.000.000 IOPS (2 x 500.000 IOPS) with the indicated workload profile. - Lot nr. 6 : 600.000 IOPS (2 x 300.000 IOPS) with the indicated workload profile. - Lot nr. 7 : 400.000 IOPS (2 x 200.000 IOPS) with the indicated workload profile. Can you please confirm the above or you accept a decrease in performance, in terms of IOPS and response time.
Answer (6 Sep 2024, 14:04):
Technical specifications of the storage systems (Lot 5, 6, 7) have clear requirements regarding the Availability of the systems: [...- lack of decrease in the required equipment efficiency in the event of a failure of half of the controllers; - lack of decrease in the required performance in the event of a failure of half of the controllers;...] Thus, requested availability of performance need to be sustained even in the event of the failure of half of the controllers in the system, strictly in accordance with technical requirements that reflects minimum requirements of the Contracting Authority. Sizing of the technological solutions and platform, as well as technical offer preparation which cumulatively must meet the requirements, is the responsibility of the interested bidders.
Date:
26 Jul 2024, 09:00
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7: Deduplication
Question:
“Deduplication: - The equipment must enable deduplication functionality for volumes accessible at block level (iSCSI/FC LUN), file level volumes and globally for each system. - The equipment must enable compression functionality for block-level volumes (iSCSI/FC LUN) and file-level volumes; Clarification Question: Taking into consideration that the requested storage equipment is block only (protocols requested are FibreChannel or iSCSI and also the requested connection is Fibre Channel 32 Gbps only), please accept also storage equipments that support only block storage protocols (iSCSI and FC) for compression and deduplication.
Answer (6 Sep 2024, 14:05):
Contracting Authority, confirm that interested bidders can offer storage solutions and platform that supports only block level storage protocols (iSCSI and FC) for compression and deduplication. The phrase ”file level” was eliminated from technical requirements, documentation was amended accordingly.
Date:
26 Jul 2024, 09:02
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7: “The system must provide at least 300 snapshots for each shared volume”
Question:
Clarification Question: In order not to limit the participation for consecrated storage vendors, please accept the number of snapshots per volume to 256 with the condition that the proposed storage supports maximum of 15.000 snapshot per system
Answer (6 Sep 2024, 14:05):
The requirement [...The system must provide at least 300 snapshots for each shared volume;...] does not limit in anyway participation of the interested bidders to propose the storage solutions from different vendors, the requirement is minimum and mandatory taking into consideration that - in a typical year, there are 365 days from which 52 Sundays, plus official Holydays. Contracting Authority is the holder of the most national importance registers and informations systems, thus through the lens of the minimum cyber security requirements stipulated in HG 201/2017, the Agency has obligations to ensure the business-continuity of the activity, the application of the management policies of backup copies(on daily basis) and recovery procedures in case of disaster.
Date:
26 Jul 2024, 09:03
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7: “The system must include a performance monitoring and prioritization mechanism for Storage QoS applied at the volume, LUN, and file levels.”
Question:
Clarification Question: Taking into consideration that the requested storage equipment is block only (protocols requested are FibreChannel or iSCSI and also the requested connection is Fibre Channel 32 Gbps only), please accept also storage equipments that support only block storage protocols (iSCSI and FC) for performance monitoring and prioritization mechanism for Storage QoS.
Answer (6 Sep 2024, 14:07):
Contracting Authority, confirms that interested bidders can offer storage solutions and platform that supports only block level storage protocols (iSCSI and FC) for performance monitoring and prioritization mechanism for Storage QoS. The phrase ”file level” was eliminated from technical requirements, documentation was amended accordingly.
Date:
26 Jul 2024, 09:14
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7: “Displaying warnings about threats to information about logging”
Question:
Clarification Question: Taking into consideration that this requirements is specific only to a SIEM product, please accept storage products do not have this functionality, but can create immutable snapshots for the volumes as protection for ransomware attacks.
Answer (6 Sep 2024, 14:08):
Contracting Authority is the holder of the most national importance registers and informations systems, thus through the lens of the minimum cyber security requirements stipulated in HG 201/2017 in respect of the provisions on operational security, the Agency has obligations to ensure the the application of event journaling mechanisms - logging the events. The mentioned requirement does not limit in anyway participation of the interested bidders to propose the storage solutions from different vendors, the requirement is minimum and mandatory. Bidders must take into account that the published requirements are minimal, so the proposed solutions can include other additional functionalities more advantageous not indicated in the requirements, for example with an emphasis on protection against ransomware attacks and other cyber threats.
Date:
26 Jul 2024, 09:16
Question's name:
Requirement for Lot nr.5 , nr. 6, nr. 7
Question:
“- The platform must enable the prediction of space growth along with the analysis of future expansion. - The portal must enable the simulation of capacity increase depending on the type of application. - ….., prediction of future space,…….” Clarification Question: In order not to limit the participation of the consecrated storage vendors, please accept also storages that can create reports regarding the capacity, because all the vendors that have this functionality are using for management cloud monitoring solution (NOT on prem management solutions) that require external connection to the cloud provider.
Answer (6 Sep 2024, 14:09):
The Monitoring requirements for portal(platform) available via a web browser must comply with all technical specifications for this chapter and enable the PREDICTION of space growth along with the analysis of future expansion, as well as other requirements. The analyze (analytical) functionalities can be either cloud based vendor` solution or on premises environment of the Contracting Authority. The bidders must clear specify in their offers if proposed one is on premises or cloud based. But taking into consideration the sensitive character of content of the national importance registers and informations systems, that must be duly protect, for on cloud based solution option for analyze(analytical prediction/simulation) functionalities, the Contracting Authority reserve the right for the stage of technical evaluation to request from bidders to obtain from the storage equipment manufacturers, the official statement regarding the secure methods of connecting and sampling telemetric data from storage systems, as well as the set of data that will be interpellated. In addition to the above mentioned, the manufacturer must describe the period for which the collected telemetric data will be stored and the data protection mechanisms. For the cross-border transport of telemetric data from storage systems, it will be necessary to apply the tools available within the Agency through the Security Information and Events Management (SIEM) system, for which a confirmation from the manufacturer regarding the possibility of integration with such system will be required.
Date:
29 Jul 2024, 10:51
Question's name:
Clarificari la cerinte tehnice
Question:
Buna ziua. Va rugam sa clarificati urmatoarele: - Can you be more specific with request "Lack of decrease of efficiency". Efficiency is meant in what sense? - Can you provide more details and explanation for request "100% full capacity reading"? - Can you explain request in availability part of RFP to be online in case of "two user data carriers"? What is "user data carrier"? - Can you please give more explanation for availability request "The equipment must allow to safely disable the device that does not cause user data loss"? Can we understand this request that storage should be able to disable faulty device without any interruptions? - Can you explain what is meant with RAID request "support pass trough mode"? - You require combined performance of 500.000. Can you explain what is meant by combined? - Equipment that is requested in this RFP is block storage with FC/iSCSI connectivity, but under deduplication you require "file level" deduplication and compression. Can you explain what is meant by file level or can we understand this as a plan to stora "file share" data on storage amongst all other types of data?
Answer (6 Sep 2024, 14:11):
) & 2) - Answer: For any failure, storage system will continue serve with required performance and functionalities/features. For example, if half of the controllers fail, all space (100%) and resources (100%) should be available for reading. Accordingly, the requirements in question are to be treated as - 100% of the required read capacity must be available for use while maintaining the performance, all functionality, and other functional specifications set forth in the documentation. No degradation is accepted, except for components that will be replaced in accordance with established warranty requirements. 3) Answer: Availability requirements must be examined in accordance with the requirements for Cluster requirement and replication. The “two user data carriers” is equvalent to “two data disks”. 4) Answer: Yes, without any interruptions. This requirement states that when the equipment is switched off by the administrator, all data on the equipment will not be lost/without data corruption and failure of the main device, in other words, the equipment must have a shutdown functionality/command. 5) Answer: If the equipment involves the use of RAID, the requirement is to Support Pass-through mode, for other solutions(no use of RAID) ingnore. 6) Answer: The specified requirement - Min. 500,000 IOPS has clear answer in the documentation: IOPS are calculated according to the following principle: - Read/write ratio - 70/30; - Block size - 16K/32K/64K; 7) Answer: The Contracting Authority confirms that interested bidders can offer storage solutions that support only block-level storage protocols (iSCSI and FC) for compression and deduplication
Date:
29 Jul 2024, 10:52
Question's name:
Clarificari adaugatoare la cerinte tehnice
Question:
Va rugam sa clarificati urmatoatele: - Can you explain request "Deduplication cannot be stopped in any way or possible to exclude the system administrator"? System administrator should not be excluded for what? - Can you be more specific for the "Compression can't cannot be turned off or manufacturers service" request? What is meant with manufactures service? - In the snapshots requirement, what is meant by safe mode? - what is meant by "file level" request "The system must include a performance monitoring and prioritization mechanism for Storage QoS applied at the volume, LUN, and file levels" considering that object of purchase i block storage? - Is "Simulation of capacity increase" meant as "predictive capabilities"?
Answer (6 Sep 2024, 14:13):
)& 2) – Answer: The equipment must have the data deduplication and compression mechanisms in In-Line mode. For any failure (hardware/software or human factor = system administrator) In-Line deduplication and/or compression can’t be stopped. 3) Answer: The Snapshot requirement”- The system must provide snapshot functionality in Safe mode;” was eliminated from the technical requirements for equipments specified in Lots 5, 6 and 7. 4) Answer: The phrase ”file level” from the technical requirements for Lots 5, 6 and 7 where eliminated, therefore these requirements will have the following content: from [Deduplication: ...- The equipment must enable deduplication functionality for volumes accessible at block level (iSCSI/FC LUN), file level volumes and globally for each system. - The equipment must enable compression functionality for block-level volumes (iSCSI/FC LUN) and file-level volumes;...] to [Deduplication: ...- The equipment must enable deduplication functionality for volumes accessible at block level (iSCSI/FC LUN) volumes and globally for each system. - The equipment must enable compression functionality for block-level volumes (iSCSI/FC LUN);...] from [Snapshot ...- The system must include a performance monitoring and prioritization mechanism for Storage QoS applied at the volume, LUN, and file levels...] to [Snapshot ...- The system must include a performance monitoring and prioritization mechanism for Storage QoS applied at the volume and LUN levels...] from [Monitoring: - The system must include a performance monitoring and prioritization mechanism for Storage QoS applied at the volume, LUN and file levels...] to [Monitoring: - The system must include a performance monitoring and prioritization mechanism for Storage QoS applied at the volume and LUN levels...] 5) Answer: Yes, «predictive capabilities» based on all time device data use.
Date:
6 Sep 2024, 14:50
Question's name:
Modificare documentatiei
Question:
Bună ziua. Stimate client, ați făcut modificări documentației de licitație și, de fapt, asigurați doar 1 zi lucrătoare pentru a o studia, a pune întrebări și a răspunde la întrebări. Vă rugăm să acordați cel puțin 5 zile lucrătoare pentru a studia documentația pentru o achiziție atât de complexă. Vă mulțumim pentru înțelegere.
Answer (6 Sep 2024, 15:25):
Stimate operator economic, în documentația de atribuire au fost operate modificări în specificațiile tehnice din loturile nr. 5, 6 și nr. 7. Termenul-limită pentru depunerea clarificărilor este data de 10.09.2024, ora 10:00.
Date:
6 Sep 2024, 16:15
Question's name:
loturile 5, 6, 7 calrificare Răspuns (6 sept 2024, 13:39):
Question:
in documentatia reinoita din 06.09.24 textul pentru loturile 5, 6, 7 nu a fost inclusa modificare confirmata in raspunsul oferit (Cel puțin 2 interferețe FC pentru fiecare controller, astfel ca toate controlerele trebuie să conțină cel puțin 2 porturi SFP cu module activate). Va rugam sa modificati documentaita astfel incat aceasta cerinta obligatorie sa fie clara pentru toti ofertantii.
Answer (9 Sep 2024, 13:21):
Nu este necesar de actualizat documentația cu aceste detalii prezentate în răspunsurile de clarificare mai detaliat celor care au adresat acestea. Documentația tehnică publicată, express conține deja aceste cerințe privind numărul de interfețe pentru fiecare lot în parte, se recomandă să re-verificați cu atenție cerințele "NICs included:" pentru loturile nr. 5, nr. 6 și nr. 7.
Date:
9 Sep 2024, 15:31
Question's name:
Răspuns (9 sept 2024, 13:21): Nu este necesar de actualizat documentația cu aceste detalii prezentate în răspunsurile de clarificare mai detaliat celor care au adresat acestea. Documentația tehnică publicată, express conține deja aceste cerințe privind numărul de interfețe pentru fiecare lot în parte, se recomandă să re-verificați cu atenție cerințele "NICs included:" pentru loturile nr. 5, nr. 6 și nr. 7.
Question:
Raspunsul dumneavoastra, nu clarifica suficient intreabrea acordata. Actualizarea mentionata in documentatie necesita precizare expres pentru loturile 5, 6, 7 nu a fost inclusa modificare confirmata in raspunsul oferit (Cel puțin 2 interferețe FC pentru fiecare controller, astfel ca toate controlerele trebuie să conțină cel puțin 2 porturi SFP cu module activate), va rugam sa precizati , daca sunt necesare minimum 2 per controler sau 2 per sistem?
Answer (10 Sep 2024, 09:27):
Cerințele tehnice conțin toate specificațiile minime stabilite de autoritatea contractantă. Astfel, pentru loturile nr. 5, nr. 6 și nr. 7, pentru fiecare sistem de stocare (storage) aparte trebuie să fie propus minimum 2 controlere in HA (high availability) mode și respectiv, pentru fiecare controler câte minim 1 interfața: FC SPF. Vă rugăm. să re-examinați cu atenție documentația per ansamblu, cu accent cumulativ cât pe cerința privind: 1) Controllers: - The system must include at least 1 node consisting of 2 controllers in HA (high availability) mode. atat si - 2) NICs included: Min. x 1GE management; min. 2 x 32Gb FC SFP+, identical, with SFP+ SR MM module included. În caz că sistemul de stocare care intentionați sa fie propus, din considerente constructive tehnologice, prevăd mai multe decăt 1 interfață FC per fiecare controler, acestea urmează să fie specificate în oferta tehnică corespunzator.
Date:
9 Sep 2024, 15:40
Question's name:
Răspuns (6 sept 2024, 13:53): NOTA: Continuare raspuns din 23.07.2024, ora 13:14 (intrebarea de mai sus)Astfel pentru evaluarea corectă de corespundere cu nivelurile minime de performanță, ofertanții vor prezenta instrumentul corespunzător de la producătorul sistemului de stocare (denumirea instrumentului, referință/web-link) pentru evaluarea și verificarea de către Autoritatea contractantă conform parametrilor, inclusiv și raportul de distribuție la care se face referință în prezenta întrebare, stabiliți în documentație: ”IOPS are calculated according to the following principle: - Read/write ratio - 70/30; - Block size - 16K/32K/64K; - Sequential and random I/O; - Delay – 0.001 s;” Astfel, performanța echipamentelor ce vor fi propuse, pe bază de IOPs urmează să fie calculate conform următorului principiu: - Raport de citire/scriere aleatorie - 70/30, dimensiune bloc - 16K, latență – max 0,001 s; - De asemenea, trebuie să fie prezentate IOPs secvenţiale, GB/s, latenţă. Opțional, se vor prezenta în ofertă - Performanță aleatorie pentru dimensiunea blocului - 32K/64K.
Question:
Va rugam sa specificati clar aceste cerinte (De asemenea, trebuie să fie prezentate IOPs secvenţiale, GB/s, latenţă. Opțional, se vor prezenta în ofertă - Performanță aleatorie pentru dimensiunea blocului - 32K/64K.) se refera la cerinta de asigurare a performantei minime de 500,000 IOPS? sau sint optionale doar pentru evaluare?
Answer (10 Sep 2024, 09:52):
Autoritatea contractantă din start a stabilit suficient de clar cerințele de performanță pentru fiecare lot în parte, a se consulta cu atenție compartimentul "Performance requirement:..", pentru fiecare lot în parte fiind stabilite valori minime de IOPs, precum și principiile cum va urma să fie confirmată aceasta, în speță pentru lotul 5: "IOPS are calculated according to the following principle: - Read/write ratio - 70/30; - Block size - 16K/32K/64K; - Sequential and random I/O; - Delay – 0.001 s;" La etapa de evaluare a ofertelor tehnice, în lipsa efectiv a sistemelor de stocare care să fie posibil de testat fizic și logic, prin mecanismele și principiile stabilite, furnizorii vor prezenta în ofertele sale raportul de corespundere la cerințele de performantă în baza principiilor descrise, care trebuie să fie confirmate de către producatori, respectiv, prin instrumentele acestuia întru susținerea corespunderii la cerința de performanță. În răspunsul de clarificare anterior a fost indicat, că la etapa de evaluare va fi suficient să fie puse la dispoziție raporturile pentru Block size - 16K, cele de 32K/64K se vor testa nemijlocit la recepționarea bunurilor și punerea în funcțiune. În caz că furnizorii prin producătorii de sisteme de stocare au posibilitate să puna la dispoziție raporturile și pentru Block size 32K/64K, la fel sunt binevenite.
Lotul nr. 5 Sisteme de stocare Full flash tip 1
Date:
9 Sep 2024, 16:58
Question's name:
Max Capacity
Question:
Va rugam sa clarificati care este capacitatea maxima la care sa fie posibil de extins sistemul de stocare prin adaugare de polite cu discuri.
Answer (10 Sep 2024, 09:30):
Autoritatea contractantă nu a stabilit valorile maxime a capacității sistemelor de stocare, a se consulta compartimentul "Capacity: min. usable space...", pentru fiecare lot în parte fiind stabilite valorile minime. Este la discreția operatorilor economici să propună în ofertele sale capacități de stocare mai avantajoase decât cerințele minime.
Lotul nr. 5 Sisteme de stocare Full flash tip 1
Date:
9 Sep 2024, 16:59
Question's name:
Max Capacity 2
Question:
Va rugam sa clarificati daca extinderea de capacitate presupune doar discuri NVME sau se admite si SAS discuri.
Answer (10 Sep 2024, 09:34):
Autoritatea contractantă anterior a răspuns deja, că Sistemele de stocare care fac obiectul achiziției sunt preconizate fără planificarea extinderii pe viitor. Recomandăm să consultați compartimentul "Type Drives:...", pentru fiecare lot în parte fiind stabilite tipurile acceptabile de discuri. Este la discreția operatorilor economici să propună în ofertele sale capacități de stocare mai avantajoase care să rezulte în posibilitatea de extindere pe viitor (cu menținerea aceluiași tip de discuri indicate in "Type Drives:..."), aceasta opțiune de extindere de fapt nefiind o cerință stabilită în documentație.
Lotul nr. 5 Sisteme de stocare Full flash tip 1
Date:
9 Sep 2024, 17:02
Question's name:
Max Capacity 3
Question:
Va rugam sa precizati daca extinderea capacitatii de stocare prin adaugarea politelor cu discuri se accepta prin conectarea in cascada, sau necesita sa fie facute direct in nodul central (controller enclosure)?
Answer (10 Sep 2024, 09:38):
Autoritatea contractantă anterior a răspuns deja, că Sistemele de stocare care fac obiectul achiziției sunt preconizate fără planificarea extinderii pe viitor. Este la discreția operatorilor economici să propună în ofertele sale capacități de stocare mai avantajoase care să rezulte în posibilitatea de extindere pe viitor, aceasta opțiune de extindere de fapt nefiind o cerință stabilită în documentație. Cât privește modalitatea tehnologică de realizare a extinderei "...conectarea în cascadă, sau necesită să fie făcute direct în nodul central (controller enclosure)", este totalmente în sarcina furnizorului de a descrie aceste opțiuni în caz că vor fi propuse.