Select the type of procedure
1
Enquiry period
with
03.07.2020 14:19
to 09.07.2020 10:00
to 09.07.2020 10:00
2
Bidding period
with
09.07.2020 10:00
to 16.07.2020 10:00
to 16.07.2020 10:00
3
Auction
will not be used
4
Evaluation
5
Contract
Status
Evaluation
Estimated value without VAT
816 416 MDL
Period of clarifications:
3 Jul 2020, 14:19 - 9 Jul 2020, 10:00
Submission of proposals:
9 Jul 2020, 10:00 - 16 Jul 2020, 10:00
Supplier technical support:
(+373) 79999801
This procedure is carried out without auction. Your offer is final and must contain the entire list of required documents.
Subscribe impossible
during the period Evaluation
Lucrări de reparaţie a coridoarelor la LT G.Meniuc
Information about customer
Title
Fiscal code/IDNO
Address
MD 2068, MOLDOVA, mun.Chişinău, mun.Chişinău, str.Kiev 5a
Web site
---
The contact person
Purchase data
Date created
3 Jul 2020, 14:19
Date modified
6 Jul 2020, 14:09
Achizitii.md ID
21025655
MTender ID
CPV
45400000-1 - Lucrări de finisare a construcţiilor
Type of procedure
Request price offers (works)
Award criteria
The lowest price
Funding sources
List of lots
Lot nr. 1 - Lucrări de reparaţie a coridoarelor la LT G.Meniuc
Budget: 816416.0 MDL
Active
Documents of the procurement procedure
anunt de participare meniuc coridoare.pdf
anunt de participare meniuc coridoare.pdf
Documents history
-
anunt de participare meniuc coridoare.pdf
anunt de participare meniuc coridoare.pdf
ID: 2043c9c6-a9f9-4957-b5d5-a077c73ca03a
tenderNotice
-
anunt_lucrari coridoare lt g. meniuc.doc
ID: 2043c9c6-a9f9-4957-b5d5-a077c73ca03a
tenderNotice
tenderNotice
Anunt de participare
3.07.20 14:54
Lucrări de reparaţie a coridoarelor la LT G.Meniuc
Date:
6 Jul 2020, 14:09
Question's name:
caietul de sarcina
Question:
poz. 12 indicati dimensiunile grilelor de ventilare.
poz. 38 indicati concret ce automete solicitati.
poz. 41 pentru a indica pretul e nevoie de stiut parametrii ce le solicitati. Cite pozitii include?
Answer (7 Jul 2020, 10:45):
Poz. 12 Montarea grilelor de ventilatie (la tavane armstrong) Diametru 10 cm; Forma-Rotunda; Material- ABS plastic; Tip- Grila de alimentare și evacuare.
Poz 38 Automat mono-, bi-, tripolar, montat pe construcții pe perete sau coloana, curent pana la 25 A, ACEASTA INSEAMNA AUTOMAT TREBUIE SA FIE PÂNĂ LA 25 A, ADICĂ DE OBICEI SE FOLOSEȘTE 16A!!!
Poz 41 Tabloul electric, gata echipat 265X310X120 мм, TIP METAL
Date:
7 Jul 2020, 11:01
Question's name:
caietul de sarcina
Question:
poz. 38 atunci concret automat mono-, bi-, tripolar? pretul difera, nui destul sa spuneti ca e de 16A. Poz 41 ce inseamna gata echipat? cu ce echipat? cutie p/u 9, 12, 24, 36 ... automete?
Answer (7 Jul 2020, 11:41):
Poz 38 Intrerupator automat VA47-29M 2P 16C
Capacitatea de deconectare (А) 6000А
Clasa de declansare B
Conectarea firelor (mm2) Flexibile pana la 25, rigide pana la 35mm2
Frecventa (Hz) 50Hz
Gradul de protectie IP20
Intensitatea (А) 16
Montare pe sina DIN Cu zavoare mecanice
Numarul de poli 2
Seria VA
Temperatura de lucru (°C) -25...+50°C
Tensiunea de alimentare (V) 240
Tensiunea maxima la pol (V) 80V
Termenul de exploatare 20000 cicluri mecanice, 10000 cicluri electrice
Tip Automa
Poz 41Tablou electric, gata echipat
Material Oțel
Număr de uși 1
Numărul de încuietori 1
Numarul de module 36
Dimensiuni (L x W x H x Ø) 540X310X120 mm
Culoare Gri
Tip de montare Aparent
Gradul de protecţie (IP) IP31
Tip material Metal
Date:
7 Jul 2020, 12:01
Question's name:
termeni de executie
Question:
Data deschiderii ofertelor e 16.07.2020
Termenul de executie 2 luni....
sar primi dupa toate Finisrea lucrarilor 16.09.2020 sau 30.09.2020
Stim ca antreprenorul din anul precedent a fost defaimat anume din cauza termenului (adica deschiderea la 1 septembrie)datine detaliii si asigurari ca nu vor fi probleme de genul dat.
multumim anticipat.
Answer (7 Jul 2020, 12:13):
Termenul de execuţie este indicat 2 luni, vom fi bucuroşi dacă lucrările vor fi finisate mai devreme.
Date:
8 Jul 2020, 08:39
Question's name:
Caietul de sarcini
Question:
Buna ziua. P.9, CN55A, vopseaua se executa peste grundul ”Gleta”, insă în lista de lucrari aplicarea acesteia nu se regasește. P. 8, CN53A - se are în vedere aplicarea grundului Supraton sau anologic, care nu poate fi înlocut cu Gleta din cauza diferentei de PREȚ și NORMEI de consum. Întrebare - totul rămîne ca în caietul de sarcini, adică vopseaua se aplică pe grund Supraton?
Answer (8 Jul 2020, 13:54):
Grundul Supraton nu se foloseşte daoar "Gleta". Lucrările vor fi executate conform listei cu cantităţi de lucrări elaborate în conformitate cu normele şi legislaţia în vigoare.